Uniformat II estimating Sheet

UNIFORMAT ESTIMATE  
          COST / % OF
  LEVEL 1 INFORMATION LEVEL 2 INFORMATION LEVEL 3 INFORMATION BUDGETš S. F. TOTAL˛
A SUBSTRUCTURE A10 - FOUNDATIONS A1010 - STANDARD FOUNDATIONS     0%
      A1020 - SPECIAL FOUNDATIONS     0%
      A1030 - SLAB ON GRADE     0%
    A20 - BASEMENT CONSTRUCTION A2010 - BASEMENT EXCAVATION     0%
      A2020 - BASEMENT WALLS     0%
      SUBTOTAL SUBSTRUCTURE 0   0%
B SHELL B10 - SUPERSTRUCTURE B1010 - FLOOR CONSTRUCTION     0%
      B1020 - ROOF CONSTRUCTION     0%
    B20 - EXTERIOR CLOSURE B2010 - EXTERIOR WALLS     0%
      B2020 - EXTERIOR WINDOWS     0%
      & EXTERIOR DOORS     0%
    B30 - ROOFING B3010 - ROOF COVERING & OPENINGS     0%
            0%
      SUBTOTAL SHELL 0   0%
C INTERIORS C10 - INTERIOR CONSTRUCTION C1010 - PARTITIONS     0%
      C1020 - INTERIOR DOORS     0%
      C1030 - FITTINGS / SPECIALTIES     0%
    C20 - STAIRCASES C2010 - STAIR CONSTRUCTION     0%
      C2020 - STAIR FINISHES     0%
    C30 - INTERIOR FINISHES C3010 - WALL FINISHES     0%
      C3020 - FLOOR FINISHES     0%
      C3030 - CEILING FINISHES     0%
      SUBTOTAL INTERIORS 0   0%
D SERVICES D10 - CONVEYING SYSTEMS D1010 - ELEVATORS & LIFTS     0%
      D1020 - ESCALATORS & MOVING WALKS     0%
      D1030 - OTHER CONVEYING SYSTEMS     0%
    D20 - PLUMBING D2010 - PLUMBING FIXTURES     0%
      D2020 - DOMESTIC WATER DISTRIBUTION     0%
      D2030 - SANITARY WASTE     0%
      D2040 - RAIN WATER DRAINAGE     0%
      D2090 - SPECIAL PLUMBING SYSTEMS     0%
    D30 - HVAC D3010 - ENERGY SUPPLY     0%
      D3020 - HEAT GENERATING SYSTEMS     0%
      D3030 - REFRIGERATION     0%
      D3040 - HVAC DISTRIBUTION SYSTEMS     0%
      D3050 - TERMINAL & PACKAGE UNITS     0%
      D3060 - HVAC CONTROLS & INSTRUMENTATION     0%
      D3070 - TESTING, ADJUSTING & BALANCING     0%
      D3090 - OTHER SPECIAL HVAC SYS. & EQUIPT.     0%
    D40 - FIRE PROTECTION D4010 - FIRE PROTECTION SPRINKLER SYSTEM     0%
      D4020 - STAND-PIPE & HOSE SYSTEMS     0%
      D4030 - FIRE PROTECTION SPECIALTIES     0%
      D4090 - OTHER FIRE PROTECTION SYSTEMS     0%
    D50 - ELECTRICAL D5010 - ELECTRICAL SERVICE & DISTRIBUTION     0%
      D5020 - LIGHTING & BRANCH WIRING     0%
      D5030 - COMMUNICATION & SECURITY SYSTEMS     0%
      D5090 - OTHER ELECTRICAL SYSTEMS     0%
      SUBTOTAL SERVICES 0   0%
E EQUIPMENT & FURNISHINGS E10 - EQUIPMENT E1010 - COMMERCIAL EQUIPMENT     0%
      E1020 - INSTITUTIONAL EQUIPMENT     0%
      E1030 - VEHICULAR EQUIPMENT     0%
      E1090 - OTHER EQUIPMENT     0%
    E20 - FURNISHINGS E2010 - FIXED FURNISHINGS     0%
      E2020 - MOVABLE FURNISHINGS     0%
      SUBTOTAL EQUIPMENT & FURNISHINGS 0   0%
F SPECIAL CONSTRUCTION  F10 - SPECIAL CONSTRUCTION F1010 - SPECIAL STRUCTURES     0%
  & DEMOLITION   F1020 - INTEGRATED CONSTRUCTION     0%
      F1030 - SPECIAL CONSTRUCTION SYSTEMS     0%
      F1040 - SPECIAL FACILITIES     0%
      F1050 - SPECIAL CONTROLS & INSTRUMENTATION     0%
    F20 - SELECTIVE BUILDING F2010 - BUILDING ELEMENTS DEMOLITION     0%
             DEMOLITION F2020 - HAZARDOUS COMPONENTS ABATEMENT     0%
      SUBTOTAL SPECIAL CONST. & DEMO 0   0%
G BUILDING SITE WORK G10 - SITE PREPARATION G1010 - SITE CLEARING     0%
      G1020 - SITE DEMOLITION & RELOCATIONS     0%
      G1030 - SITE EARTHWORK     0%
      G1040 - HAZARDOUS WASTE REMEDIATION     0%
    G20 - SITE IMPROVEMENTS G2010 - ROADWAYS     0%
      G2020 - PARKING LOTS     0%
      G3030 - PEDESTRIAN PAVING     0%
      G2040 - SITE DEVELOPMENT     0%
      G2050 - LANDSCAPING     0%
    G30 - SITE CIVIL / MECHANICAL UTILITIES G3010 - WATER SUPPLY & DISTRIBUTION SYSTEMS     0%
      G3020 - SANITARY SEWER SYSTEMS     0%
      G3030 - STORM SEWER SYSTEMS     0%
      G3040 - HEATING DISTRIBUTION     0%
      G3050 - COOLING DISTRIBUTION     0%
      G3060 - FUEL DISTRIBUTION     0%
      G3090 - OTHER CIVIL / MECHANICAL UTILITIES     0%
    G40 - ELECTRICAL UTILITIES G4010 - ELECTRICAL DISTRIBUTION     0%
      G4020 - EXTERIOR LIGHTING     0%
      G4030 - EXTERIOR COMMUNICATION & SECURITY     0%
      G4090 - OTHER SITE ELECTRICAL UTILITIES     0%
    G90 - OTHER SITE CONSTRUCTION G9010 - SERVICE TUNNELS     0%
      G9090 - OTHER SITE SYSTEMS & EQUIPMENT     0%
      SUBTOTAL BUILDING SITE WORK 0   0%
            0%
      TOTAL PRELIMINARY BUDGET 0   0%
Y MISC.          
      DESIGN  CONTINGENCY      
      ESCALATION      
      TOTAL ESTIMATED TRADE COSTS 0    
      CM/GC GENERAL CONDITIONS      
      PRECONSTRUCTION SERVICES      
      CM/GC PERSONNEL      
      CM  FEE/GC PROFIT      
      SUBTOTAL AE FIXED LIMIT OF CONSTRUCTION 0    
      PROJECT SUBTOTAL 0    
      CM CONTINGENCY      
      SUBTOTAL CM FIXED LIMIT OF CONSTRUCTION 0    
      PROJECT SUBTOTAL 0    
      CHILLED WATER CONNECTION FEE ALLOWANCE      
      SIDEWALK CLOSURE ALLOWANCE FOR AA      
      SUBTOTAL ALLOWANCES 0    
      PROJECT SUBTOTAL 0    
Z ALTERNATES   ALTERNATE #1      
      DESCRIPTION #1      
      DESCRIPTION #2      
      CONTINGENCY      
      SUBTOTAL ALTERNATE #1 0    
      PROJECT SUBTOTAL 0    
      ALTERNATE #2      
      DESCRIPTION #1      
      DESCRIPTION #2      
      CONTINGENCY      
      SUBTOTAL ALTERNATE #2 0    
      PROJECT SUBTOTAL 0    
             
    PROJECT TOTAL 0   0%