Pre Construction Process

A preliminary constructability review should be  conducted to ensure that project can be put out to bid and constructed with a minimum of Addendums and RFIs due to existing constrains, conflicting conditions, and errors‐ omissions in the construction documents, and to ensure
that the project can be built using the industry accepted means and methods as designed, within the specified timeframe, with the specified quality and with safe work practice.

Comparing the intended design to actual project.

  1. is the project constructable as designed
  2. is the expected duration feasible
  3. is the project constructable within the intended budget

bidding process